Development Application: Proposed extension of the area to an existing Mining Operation - Lots 63 and 64 Hopeland Road and Lots 507, 508, 201 Elliot Road, Keysbrook

Share Development Application: Proposed extension of the area to an existing Mining Operation - Lots 63 and 64 Hopeland Road and Lots 507, 508, 201 Elliot Road, Keysbrook on Facebook Share Development Application: Proposed extension of the area to an existing Mining Operation - Lots 63 and 64 Hopeland Road and Lots 507, 508, 201 Elliot Road, Keysbrook on Twitter Share Development Application: Proposed extension of the area to an existing Mining Operation - Lots 63 and 64 Hopeland Road and Lots 507, 508, 201 Elliot Road, Keysbrook on Linkedin Email Development Application: Proposed extension of the area to an existing Mining Operation - Lots 63 and 64 Hopeland Road and Lots 507, 508, 201 Elliot Road, Keysbrook link

The subject application seeks approval to extend the mining area (The Keysbrook Western Extension Project) by a further 375ha of mine area located within the Shire of Serpentine Jarrahdale.

  • The mine operates 24 hours a day, 7 days a week with all mining earthwork activities ceasing between 7:00pm and 7:00am.
  • The operations include the mining and processing of heavy mineral sands from silica sand deposits present within the soils.
  • The extracted and screened minerals are pumped via pipes to the concentrator plant within the Shire of Murray for processing.
  • The extracted mineral sands contain titanium mineral leucoxene and zircon which have a variety of commercial uses.
  • Ore is mined progressively via a series of shallow open-cut pits to a maximum depth of 6m below ground level.
  • The mining areas are then progressively rehabilitated back to pastureland. Mining is expected to occur for approximately 5 and a half years.

Submissions on the proposed extension of time and amendment to approved extractive industry may be lodged by one of the following ways:

  • Email your feedback to info@sjshire.wa.gov.au stating the following reference number: PA25-5302
  • A written submission, submitted by mail or in person to 6 Paterson Street, Mundijong, including the reference number: PA25-5302

Submissions close Wednesday 3 July 2025 5:00pm.

The subject application seeks approval to extend the mining area (The Keysbrook Western Extension Project) by a further 375ha of mine area located within the Shire of Serpentine Jarrahdale.

  • The mine operates 24 hours a day, 7 days a week with all mining earthwork activities ceasing between 7:00pm and 7:00am.
  • The operations include the mining and processing of heavy mineral sands from silica sand deposits present within the soils.
  • The extracted and screened minerals are pumped via pipes to the concentrator plant within the Shire of Murray for processing.
  • The extracted mineral sands contain titanium mineral leucoxene and zircon which have a variety of commercial uses.
  • Ore is mined progressively via a series of shallow open-cut pits to a maximum depth of 6m below ground level.
  • The mining areas are then progressively rehabilitated back to pastureland. Mining is expected to occur for approximately 5 and a half years.

Submissions on the proposed extension of time and amendment to approved extractive industry may be lodged by one of the following ways:

  • Email your feedback to info@sjshire.wa.gov.au stating the following reference number: PA25-5302
  • A written submission, submitted by mail or in person to 6 Paterson Street, Mundijong, including the reference number: PA25-5302

Submissions close Wednesday 3 July 2025 5:00pm.

Page last updated: 04 Jun 2025, 01:44 PM