Draft West Mundijong Industrial Area Structure Plan 2020

Share Draft West Mundijong Industrial Area Structure Plan 2020 on Facebook Share Draft West Mundijong Industrial Area Structure Plan 2020 on Twitter Share Draft West Mundijong Industrial Area Structure Plan 2020 on Linkedin Email Draft West Mundijong Industrial Area Structure Plan 2020 link

This project is complete 

Image of rural Mundijong

Outcome

At its March meeting, Council recommended to the Western Australian Planning Commission that the proposed West Mundijong Industrial Area Structure Plan be approved subject to the Schedule of Modifications. To view the Council decision, visit the Shire's Agenda and Minutes page and view the March Council Meeting Minutes.

Background

The Shire has prepared the above mentioned structure plan in regard to land located in West Mundijong Industrial Area Precinct.

  • This structure plan provides for a phased approach to subdivision. The first phase is termed a dry lot industrial subdivision, which is subject to a minimum lot size of 1.5 -2ha;
  • This first phase is not reliant on reticulated water or sewer infrastructure being provided;
  • The 1.5 - 2ha minimum lot size requirement is to provide flexibility for onsite potable water catchment (via water tanks) and onsite effluent disposal;
  • Intensity of development is also compatible with current road infrastructure limits, and the planned upgrades reflective of the Development Contribution Scheme for the area.

Plans and documents setting out and explaining the draft structure plan have been deposited at the Shire’s administration building at 6 Paterson Street, Mundijong and is available for inspection during office hours between 8:30am to 5pm. Alternatively, you can access the plans on the right hand side of this page under "documents".

Making a submission

Submissions on the structure plan may be lodged by one of the following ways:

  • Email your feedback to info@sjshire.wa.gov.au stating the following reference number: PA20/1197
  • A written submission, submitted by mail or in person to 6 Paterson Street, Mundijong, including the reference number: PA20/1197, property affected and details of the submission and lodged with the undersigned. A submission form is available on the right hand side of this page under "documents".

Submissions close 5pm, 24 January 2021.

Outcome

At its March meeting, Council recommended to the Western Australian Planning Commission that the proposed West Mundijong Industrial Area Structure Plan be approved subject to the Schedule of Modifications. To view the Council decision, visit the Shire's Agenda and Minutes page and view the March Council Meeting Minutes.

Background

The Shire has prepared the above mentioned structure plan in regard to land located in West Mundijong Industrial Area Precinct.

  • This structure plan provides for a phased approach to subdivision. The first phase is termed a dry lot industrial subdivision, which is subject to a minimum lot size of 1.5 -2ha;
  • This first phase is not reliant on reticulated water or sewer infrastructure being provided;
  • The 1.5 - 2ha minimum lot size requirement is to provide flexibility for onsite potable water catchment (via water tanks) and onsite effluent disposal;
  • Intensity of development is also compatible with current road infrastructure limits, and the planned upgrades reflective of the Development Contribution Scheme for the area.

Plans and documents setting out and explaining the draft structure plan have been deposited at the Shire’s administration building at 6 Paterson Street, Mundijong and is available for inspection during office hours between 8:30am to 5pm. Alternatively, you can access the plans on the right hand side of this page under "documents".

Making a submission

Submissions on the structure plan may be lodged by one of the following ways:

  • Email your feedback to info@sjshire.wa.gov.au stating the following reference number: PA20/1197
  • A written submission, submitted by mail or in person to 6 Paterson Street, Mundijong, including the reference number: PA20/1197, property affected and details of the submission and lodged with the undersigned. A submission form is available on the right hand side of this page under "documents".

Submissions close 5pm, 24 January 2021.

This project is complete